WellBossProduct specifications
Products / Boss HPHT Composite Frac Plug
Frac and bridge plugs

Boss HPHT Composite Frac Plug

Boss HPHT is a composite frac plug rated up to 15,000 psi and 350 °F for plug-and-perf completions, made from a proprietary resin-based composite with an average 12.5-minute drillout in field use. Sizes fit 4-1/2" 15.1 and 18.8 lb/ft and 5-1/2" 23 and 26 lb/ft casing.

Key specifications

Plug type
Composite frac plug, high pressure / high temperature
Pressure rating
Up to 15,000 psi
Temperature rating
Up to 350 °F (177 °C)
Casing sizes
4-1/2" 15.1 and 18.8 lb/ft; 5-1/2" 23 and 26 lb/ft
Material
Proprietary resin-based composite; minimal metal content
Drillout
Average 12.5 minutes in field applications under extreme conditions
Presets
No presets
Conveyance
Wireline, slickline or coiled tubing

Sizes and dimensions

Sizes
Plug OD (in)Casing size (in)Casing weight (lb/ft)
4.2505-1/223
4.1255-1/226
3.5004-1/215.1
3.3754-1/218.8

Features

Applications

Need a size, rating or metallurgy not listed?

Bespoke design is a WellBoss specialty. Our engineers design packers and completion tools to your specification: casing and tubing, pressure and temperature, ports and feed-throughs, connections, metallurgy and API 11D1 / ISO 14310 validation grade. Designs are built and tested in our Dubai facility.

How bespoke design works

Questions buyers ask

Does WellBoss make a 15,000 psi, 350 °F frac plug for 4-1/2 inch 15.1 lb/ft casing?

Yes. Boss HPHT has a 3.500" OD size for 4-1/2" 15.1 lb/ft casing and is rated up to 15,000 psi and 350 °F. A dissolvable option, SoluBoss HPHT, is also rated 15,000 psi in 4-1/2" 15.1 lb/ft.

How long does Boss HPHT take to drill out?

An average of 12.5 minutes in field applications under extreme conditions.

Is there a lower-cost plug for 10,000 psi stages?

Yes. The Boss Standard composite frac plug is rated 10,000 psi and 250 °F; a mixed program of Boss Standard and Boss HPHT lowers cost across pressure tiers.

Source: WellBoss 2026 Product Catalog, page 113; WellBoss technical proposal, 2026. Ratings are from WellBoss published data; confirm the final rating for your well conditions with WellBoss engineering when you request a quote.